Requirement to CN Group

CN Group was asked to extend the customer’s in-house IT team with new CN team members to gain higher velocity, shorter delivery times as well as bringing the latest trends and technologies to the project. The goal for the joint team was to develop a new solution and deliver the Minimal Viable Product (MVP) in January 2020. The application solution desired should allow thinkproject’s employees to perform formal checks of uploaded documents or new versions, including high quality validation, while reducing the average time spent on a single document.

Technologies
Java 13 logo
Java 13
Spring Boot logo
Spring Boot
Angular 8 logo
Angular 8
PWA
PWA
Jenkins logo
Jenkins
H2 logo
H2
PostgreSQL logo
PostgreSQL
Liquibase logo
Liquibase
Provided services
  • Analysis
  • Software development

Interesting facts

  • From design prototype to real application in 6 months

  • Start of cooperation in only 10 weeks following the first contact

  • First CN Group project in Dresden

  • One of the first times Progressive Web Apps (PWA) used in CN Group

Solution:

CN Group cooperated on the project from the very beginning, extending the team with two developers with both backend and frontend capabilities, and a Product Owner Proxy (Consultant) team member. The proximity of Dresden to CN Group’s Prague headquarters allowed frequent on-site work and smooth integration into the customer’s IT department and company as such.

The project followed agile principles and Scrum methodology for development, typically running 2-week sprints. In May 2019, a shortened Design sprint session with target users helped to define the scope of the MVP, as well as to design the most important UI layouts and principles. By the end of 2019, the MVP was implemented, fine-tuned, and it was deployed live in January 2020 as planned, enabling earlier return on investment. The project now continues with implementation of new epics, adding new features and capabilities to the solution, which will bring additional revenue to the customer.

Want to know more about this case study?

Gallery

Screenshot of solution
Design sprint
Design sprint
prevArrow
nextArrow
CN Group

CN Group CZ a.s.
Prague Office 
Ve Smečkách 20 
110 00 Prague 1 
Czech Republic
Registration No.:
07885041

Locations
Contacts
Social Media
LinkedIn
Twitter
Xing
Facebook
YouTube
Instagram
© 2020 CN Group CZ a.s., All rights reserved.
  • Sitemap
  • Legal Terms / Impressum
  • GDPR